5 Job openings found

1 Opening(s)
4.0 Year(s) To 7.0 Year(s)
5.40 LPA TO 6.00 LPA
Role Summary The Assistant Manager – Quantity Surveyor is responsible for managing project cost estimation, BOQ preparation, quantity take-offs, billing, contract administration, budgeting, and cost control throughout the project lifecycle. The role requires close coordination with project, engineering, procurement, finance, consultants, and contractors to ensure commercial efficiency and timely project delivery. KRA: ...
1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
5.00 LPA TO 8.00 LPA
Role Overview We are looking for an experienced Electrical Design, Estimation & Tendering Engineer capable of independently handling the design, costing, estimation and tendering of Electrical EPC projects. The candidate should be capable of taking a tender from the initial enquiry/NIT stage through technical study → quantity take-off → design → vendor enquiries → rate analysis ...
1 Opening(s)
3.0 Year(s) To 7.0 Year(s)
4.00 LPA TO 5.00 LPA
Role Summary Looking for a proactive and experienced HR Executive / HR Manager to manage end-to-end HR activities for the corporate office as well as multiple project sites across India and candidate should preferably have experience in the Electrical EPC, Solar EPC, Infrastructure, Engineering or Construction industry and be comfortable handling a large site-based workforce ...
1 Opening(s)
2.0 Year(s) To 6.0 Year(s)
2.40 LPA TO 3.50 LPA
Role Summary Manage day-to-day construction site operations, ensuring work is carried out safely, on schedule, within allocated resources, and as per approved design specifications. KRA: Task / Activities Supervise daily construction activities and coordinate site labour. Ensure work is carried out as per structural drawings, approved specifications, and safety standards. Coordinate with subcontractors, architects, vendors, ...
1 Opening(s)
7.0 Year(s) To 8.0 Year(s)
5.00 LPA TO 6.00 LPA
ROLE SUMMARYPlanning & Billing Engineer responsible for project scheduling, billing activities, progress monitoring, quantity surveying, and contract management. KRA: TASK / ACTIVITIES Develop baseline project schedules using software like Primavera P6 or MS Project to track critical path activities and milestone adherence. Prepare and verify Client Bills, Running Account (RA) bills, and Subcontractor ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile